Our Roofing Services | Rio Rico, AZ
Roof repairs, full replacements, storm damage, gutters, metal roofing, flat roofs. Rio Rico Roofing & Maintenance covers it all in Rio Rico. Licensed, insured, manufacturer-certified.
Roof Replacement
The average roof replacement in Rio Rico takes one day for a standard residential home. Larger or steeper roofs might take two. Either way, we don't leave a house uncovered overnight. If we tear it off, we cover it before we leave. No exceptions.
Get a Free Quote →Roof Repair
Missing shingles from wind damage expose the underlayment to UV degradation. If the underlayment is compromised, water intrusion follows the next rain. We don't just replace the missing shingle. We pull back surrounding courses, inspect the underlayment for UV damage and nail holes, replace compromised sections, and weave new CertainTeed Landmark or IKO Cambridge shingles into the existing field. Proper repair, not a patch.
Get a Free Quote →Storm Damage Repair
After a major storm in Rio Rico, we mobilize quickly. Emergency tarping within 24 hours to prevent secondary water damage. Then a full damage inspection once conditions allow. We use drone photography on larger commercial roofs to document everything the adjuster needs.
Get a Free Quote →New Roof Installation
We handle new construction from permits through final inspection. Our Rio Rico office coordinates with your builder on scheduling, material delivery, and inspection timing. Typical install time is 1-3 days depending on size and complexity.
Get a Free Quote →Metal Roofing
Color options in metal roofing are virtually unlimited. Matte black, charcoal, forest green, copper penny, barn red, slate blue. We order custom colors from Sheffield Metals and McElroy Metal with 40-year fade warranties. Your house, your style.
Get a Free Quote →Shingle Roofing
Architectural shingles are what we install on 90% of Rio Rico homes. They're thicker, heavier, and more wind-resistant than the old 3-tab flat shingles. They also look dramatically better. Dimensional profiles that mimic wood shake or slate. Standard architectural shingles carry a 30-year warranty. Premium versions go to 50.
Get a Free Quote →Flat Roofing
The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.
Get a Free Quote →Commercial Roofing
Multi-family properties in Rio Rico need roofing contractors who understand occupied buildings. We schedule around tenants, contain debris, and minimize noise during reasonable hours. Emergency leak repairs get priority. Water in someone's apartment is an emergency.
Get a Free Quote →Gutter Installation
Clogged gutters cause fascia rot, soffit damage, and foundation erosion from concentrated water runoff. That's not a marketing scare tactic. We see the damage on every other gutter replacement in Rio Rico. Properly sized gutters with adequate downspout capacity move water away from the house. We calculate capacity using rainfall intensity data for Rio Rico: roof area x pitch factor x rainfall rate in inches per hour. Standard 5" K-style handles 5,520 square feet of effective roof area.
Get a Free Quote →Roof Inspection
Our inspection covers the roof and the attic. From the attic, we check for daylight through the roof deck, moisture stains on rafters, mold on sheathing, and ventilation function. Problems in the attic often indicate roof issues that aren't visible from the surface.
Get a Free Quote →Emergency Roof Repair
After we secure the tarp and stop the leak, we photograph and document everything while the damage is fresh. This documentation is critical for insurance claims. Adjusters want to see the damage before any repairs are made.
Get a Free Quote →Skylight Installation
VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.
Get a Free Quote →